Fixed-scope projects
Some jobs are published as whole-project ranges rather than per square foot:
| Project | Published range | Companies |
|---|---|---|
| Gable (doghouse) dormer, one room | $18,000 – $70,000 | 3 |
| Partial rear shed dormer (1 bedroom or office) | $35,000 – $55,000 | 1 |
| Full-width rear shed dormer | $40,000 – $100,000 | 3 |
| Full Cape Cod conversion (front and rear, or roof raise) | $80,000 – $250,000 | 4 |
| Partial second story (50–70% of the footprint) | $215,000 – $385,000 | 2 |
| Full second story over a ranch | $285,000 – $575,000 | 2 |
| Rear or side addition (ground level) | $80,000 – $340,000 | 3 |
| Great room or family room addition | $50,000 – $100,000 | 1 |
| In-law (mother-daughter) suite addition | $145,000 – $295,000 | 1 |
| Adding a full bathroom upstairs in a dormer or second story | $40,000 – $60,000 | 2 |
Add these to any estimate
| Item | Published range |
|---|---|
| Structural engineering / stamped plans | $2,000 – $6,000 |
| Building permit fees for an addition or dormer | $1,500 – $5,000 |
| New foundation for a ground-level addition (Nassau) | $15,000 – $40,000 |
| Zoning variance application (plus 2–4 months) | $2,000 – $5,000 |
| Exterior staircase bump-out for a second story | $22,000 – $38,000 |
Permit fees follow each town's formula; the permit fee calculator applies the published Hempstead, Oyster Bay and Huntington formulas; Huntington's floor-area method usually comes out far lower than the others on the same job. In unsewered parts of Suffolk, adding bedrooms can also bring in the county health department and a new septic system; see cesspools and additions.
Why real quotes can be higher
Published ranges are what builders advertise. Homeowners on r/longisland have reported quotes from about $295,000 to over $800,000 for a large two-bedroom, two-bath dormer, and about $275,000 to $450,000 and up for a three-bedroom second story. Price the same stamped plans with at least three contractors, and see the full method on dormer and addition costs. The survey method is on the cost page. Permit fees sit on top and follow each town's formula; the Town of Hempstead, for example, charges $200 plus $18 per additional $1,000 under Local Law 20-2024.