When you need one
| Rule broken | Type of variance | Common Long Island example |
|---|---|---|
| Side, rear or front setback | Area variance | Rear extension too close to the back line |
| Height or eave limit | Area variance | Second story over North Hempstead’s 22-foot eave cap (§ 70-17) |
| Lot coverage or floor area | Area variance | Addition plus deck over the coverage cap |
| A use the zone doesn’t allow | Use variance | Much harder; rare for houses |
Most residential additions involve area variances, which use the balancing test below.
The five-factor balancing test
Villages and cities follow the same balancing test under Village Law § 7-712-b and General City Law § 81-b. New York’s Town Law § 267-b tells a zoning board to weigh the benefit to the applicant against the detriment to the neighborhood’s health, safety and welfare, considering (NY Town Law § 267-b):
- Whether the variance would produce an undesirable change in the neighborhood’s character or a detriment to nearby properties.
- Whether the benefit can be achieved some other feasible way.
- Whether the requested variance is substantial.
- Whether it would have an adverse effect on physical or environmental conditions.
- Whether the difficulty was self-created, which is relevant but doesn’t necessarily preclude the variance.
The Department of State’s training materials stress that every factor must be weighed but not every factor must be satisfied, and that boards should grant the minimum variance necessary (NYS DOS).
How the process usually goes
- File the building permit with plans that show the problem.
- Receive a denial. In the Town of North Hempstead it’s a Notice of Disapproval, which you take to the Board of Zoning Appeals (North Hempstead requirements).
- Apply to the board with the forms, survey, plans, photos and fee your town requires.
- Notify neighbors as the town requires.
- Public hearing. You or your architect present; neighbors can speak.
- Decision, sometimes with conditions, then back to the building department for the permit.
Cost and time
One Long Island builder publishes $2,000 – $5,000 for a variance application and two to four months for the process (published guide, checked November 2026). Architects and attorneys charge separately for preparing and presenting.
How to avoid needing one
Have the architect run the zoning analysis on a current survey before designing. Small changes, like a lower roof pitch, a narrower addition or using allowed encroachments such as the Town of Hempstead’s Levittown rule for second stories over existing walls (§ 190A(9), BZO Art. XV), often remove the need. See Town of Hempstead permits and the addition timeline.
Frequently asked questions
What are the five factors for an area variance in New York?
Under Town Law § 267-b, the board considers whether the variance would undesirably change the neighborhood's character or hurt nearby properties, whether you could reach your goal another way, whether the request is substantial, whether it would harm physical or environmental conditions, and whether the difficulty was self-created. Self-creation counts but doesn't automatically bar a variance.
How long does a variance take on Long Island?
One Long Island builder publishes two to four months. It depends on the board's calendar, notice requirements and whether the board asks for changes. Build the time into your schedule before you sign a construction contract.
How do I start a variance application?
Usually by filing for the building permit and receiving a denial. In the Town of North Hempstead, for example, the Permit Division or Plan Examination issues a Notice of Disapproval, which you use to appeal to the Board of Zoning Appeals at a public meeting.
Will the board grant less than I ask for?
It can. New York's law directs boards to grant the minimum variance necessary while protecting the neighborhood. Designs that ask for a small, well-justified variance fare better than ones that push every limit.
Sources
- NYS Department of State: area variances (2025 presentation)
- NY Town Law § 267-b: permitted action by the board of appeals
- Town of North Hempstead: requirements for submittal of a residential building permit (Notice of Disapproval)
- NY Village Law § 7-712-b: board of appeals (villages)
- NY General City Law § 81-b: board of appeals (cities)
- Town of North Hempstead Code ch. 70, Residence AA district: § 70-17 eave height (eCode360)
- Town of Hempstead BZO Article XV: Levittown Planned Residence District (§ 190)