Town of Oyster Bay Department of Planning & Development (Building Division)
- Address
- 74 Audrey Avenue, Oyster Bay, NY 11771
- Phone
- (516) 624-6200
- Website
- oysterbaytown.com/departments/planning-and-development/building
- Issues permits for
- Unincorporated hamlets such as Massapequa, Syosset, Hicksville, Plainview, Bethpage, Jericho, Woodbury, Old Bethpage and Glen Head. Villages such as Massapequa Park, Farmingdale and Bayville issue their own permits.
What the permit costs
The Department of Planning & Development’s fee schedule (Town of Oyster Bay fees):
| Item | Fee |
|---|---|
| Building permit application | $100, non-refundable |
| First $1,000 of valuation | $100 |
| Each additional $1,000 or fraction | $12 |
| Second amended permit / third or more | $150 / $200 (first amendment free) |
| Certificate of completion | $35 |
| Certificate of occupancy | $35 for the first $1,000 + $2 per additional $1,000 |
| Residential extension of time (building / plumbing permit issued after 6/1/2019) | $100/$50 first, $125/$75 second, $150/$100 third, $175/$125 fourth, $200/$150 fifth |
Worked examples
| Project valuation | Application + permit fee |
|---|---|
| $50,000 dormer | $788 |
| $150,000 addition | $1,988 |
| $300,000 second story | $3,788 |
Try other numbers in the permit fee calculator.
What a residential application needs
The town’s posted filing instructions, revised April 3, 2017, list these items (Oyster Bay instructions). The sheet predates the town’s online portal, so confirm the current list when you file:
- A notarized application, with the owner’s side signed by the property owner.
- Two sets of construction drawings by a New York licensed design professional, including foundation plans, framing plans, floor plans, plumbing risers, wiring, sections, elevations and a scaled plot plan.
- Two copies of a survey less than six months old by a licensed land surveyor, showing additions, accessory structures and setbacks.
- A residential zoning analysis submission sheet, signed, notarized, stamped and sealed by the architect or engineer.
- A notice of truss-type, pre-engineered wood or timber construction for dormers, additions, extensions and alterations that use them.
- A workers’ compensation certificate naming the Town of Oyster Bay (the ACORD form isn’t accepted) and a current Nassau County home improvement license.
The town’s online portal also asks for a notarized applicant disclosure affidavit from the applicant, homeowner and every contractor (Oyster Bay portal).
Second stories and front dormers
Two affidavits are specific to the projects this site covers:
- Affidavit of footings, foundations and existing support systems: required for all second-story additions and new houses built on an existing foundation. Your engineer has to look at what’s holding the house up before designing what goes on top. See second story additions.
- Affidavit of average setback: required for construction at the front of the house, on corner lots, and for second-story additions and dormers in front. See front dormers.
Garage conversions and parent/child units
A garage conversion must show two off-street parking spaces on the survey. A parent/child residence, the town’s term for a mother-daughter setup, ultimately requires a use variance from the Zoning Board of Appeals, a survey showing three off-street spaces and floor plans labeling both units. See garage conversions and mother-daughter additions.
Filing and contacts
The Department of Planning & Development is at 74 Audrey Avenue, Oyster Bay, (516) 624-6200, with applications through its online portal. Villages inside the town, such as Massapequa Park, Farmingdale and Bayville, issue their own permits.
Frequently asked questions
How much is a Town of Oyster Bay building permit for an addition?
The town's fee schedule lists a $100 non-refundable application fee, plus $100 for the first $1,000 of valuation and $12 for each additional $1,000 or fraction. A $150,000 addition works out to $100 + $100 + 149 × $12 = $1,988. Certificates of completion are $35.
What do I need to file for a second story in Oyster Bay?
Two sets of drawings by a New York licensed design professional, including foundation and framing plans; two copies of a survey less than six months old; a sealed residential zoning analysis sheet; an affidavit of footings, foundations and existing support systems; and an affidavit of average setback. Trusses or engineered wood need a notice too.
Can I convert my garage in the Town of Oyster Bay?
The town's filing instructions say a garage conversion must show two off-street parking spaces on the survey. If the lot can't provide them, the conversion may need zoning relief.
How do I get a mother-daughter permit in Oyster Bay?
The town calls it a parent/child residence. Its filing instructions say it ultimately requires a use variance from the Zoning Board of Appeals, a survey showing three off-street parking spaces, and two sets of floor plans labeling the primary and accessory units.