Your town’s climatic table sets the numbers
Every New York municipality fills in a climatic and geographic design table, Table R301.2(1), for its code. It lists the design wind speed, whether the area is a special wind region or wind-borne debris zone, the frost line depth and more. The Village of Quogue’s annotated table shows what an East End table looks like (Village of Quogue):
| Quogue Table R301.2(1) item | Value |
|---|---|
| Design wind speed | 130 mph, with 120 mph shown in parentheses on the village’s table (likely the older allowable-stress value; ask the building department) |
| Special wind region | Yes |
| Wind-borne debris zone | Yes |
| Frost line depth | 36 inches |
| Termite damage | Moderate to heavy |
| Ground snow load | 20 lb |
Ask your building department for its table, or your architect, who uses it on every set of plans.
The wind-borne debris region
Under New York’s 2025 Residential Code, the wind-borne debris region covers areas within one mile of the coastal mean high water line where the design wind speed is at least 130 mph, plus anywhere at 140 mph or more (2025 RCNYS chapter 3). There, windows, doors and skylights need protection from debris. Options include impact-rated units, approved shutters, or on many one- and two-story houses, precut wood structural panels with fasteners installed ahead of time.
What wind framing looks like
- A continuous load path. Roof to wall, wall to floor, floor to foundation, each joint tied with nails, straps or hold-downs so uplift can’t pull the house apart.
- Roof uplift connectors. The code requires roof framing to be attached to resist uplift (2025 RCNYS R802.11), which in high-wind areas usually means a metal tie at every rafter or truss.
- Wall bracing and sheathing. More braced wall panels and tighter sheathing nailing as wind speed rises.
- Gable end walls. Tall gable ends get extra bracing so they don’t fold in or out.
- Roof sheathing edges. Closer nail spacing at the edges and corners, where wind suction is highest.
Why it matters for additions
A dormer or second story adds height and roof area, which raises wind loads. The engineer designs the new connections and checks how they tie into the existing house. On the South Shore and East End, a framing crew that knows these details avoids failed inspections. See what the framing inspection checks and, if you’re also in a flood zone, the 50% rule.
Frequently asked questions
What is the wind-borne debris region?
It's the part of a high-wind area where windows, doors and skylights must be protected from flying debris. Under New York's 2025 Residential Code, it covers areas within one mile of the coastal mean high water line where the design wind speed is 130 mph or more, and any area where it's 140 mph or more.
Do I need impact windows near the water on Long Island?
In the wind-borne debris region, glazed openings need protection: impact-rated windows and doors, or approved shutters or panels. New York's code allows precut wood structural panels as protection on many one- and two-story houses, if they're prepared with fasteners in advance. Check what your building department accepts.
Are hurricane ties required on Long Island?
Roof framing has to be fastened to resist uplift everywhere, and in high-wind areas that usually means engineered metal connectors such as rafter ties or straps at every rafter or truss. Your plans and the code tables say what's required. The framing inspector checks them before the ceiling is covered.
Does an addition have to meet today's wind code?
The new work does. The addition's framing, sheathing, connections and openings follow the current code. Whether the existing house must be upgraded depends on the scope of work and local rules, so ask your building department.
Sources
- Village of Quogue: Table R301.2(1) climatic and geographic design criteria
- ICC: 2025 Residential Code of New York State chapter 3 (R301.2.1 wind design, wind-borne debris region)
- ICC: 2025 Residential Code of New York State chapter 8, roof-ceiling construction (R802.11 uplift)
- NYS Department of State: Building Standards and Codes