| Job | Published LI range | Median |
|---|---|---|
| Rear or side addition (ground level) | $80,000 – $340,000 | $200,000 |
| Ground-level addition, per square foot | $150 – $250 | $200 (one builder's midpoint) |
Ranges come from Long Island contractors' own published price guides. Method and every source: Long Island dormer and addition price survey.
The framing work in a kitchen extension
Three things set the framing scope:
- The opening. The old rear wall comes out to join the spaces. A beam replaces it, sized by an engineer for the roof or floor above. A flush beam hidden in the ceiling takes more labor than a dropped beam below it, because the joists have to be cut and hung from it.
- The new structure. Foundation, floor deck, walls and a roof tied into the house, like any rear extension.
- Blocking and openings. Framers add blocking for upper cabinets and wall-hung items, and frame openings for windows over the sink and patio doors.
Utilities decide a lot of the cost
- Venting. Under New York’s 2025 Residential Code, a hood that moves more than 400 cubic feet per minute needs makeup air when a fuel-burning appliance inside the air barrier isn’t direct-vent or mechanically vented (2025 RCNYS M1503.6). That adds ductwork and controls.
- Electrical. A new kitchen adds appliance circuits. If the panel or service can’t carry the new load, an upgrade is coordinated with PSEG Long Island.
- Gas. Moving or adding a gas range may need a larger line or meter work with National Grid.
- Plumbing. The sink drain and vent have to reach the existing stack. A sink in an island needs a special vent arrangement.
Kitchen extension or bump-out?
| Bump-out | Full extension | |
|---|---|---|
| Depth | A few feet, limited by the joist cantilever | As deep as setbacks and lot coverage allow |
| Foundation | Sometimes cantilevered, none | Full foundation |
| Good for | More counter, a bigger window, a banquette | Island, eating area, family room |
If you only need a few feet, read bump-out additions.
What to have ready before you call
A sketch of the kitchen layout you want, your survey, photos of the back of the house and the basement under the kitchen, and a sense of your appliance list. The load-bearing wall removal page explains how the beam is sized, and home addition cost shows published Long Island prices.
Frequently asked questions
How big should a kitchen extension be?
Big enough to fix the actual problem. If you need room for an island and a table, the extension often has to add a full new zone across the back, not just a few feet. If you need counter space on one wall, a bump-out of a few feet may do it for less. Plan the kitchen layout first, then size the addition around it.
Do I need makeup air for a big range hood?
Possibly. New York's 2025 Residential Code requires makeup air for an exhaust system that can move more than 400 cubic feet per minute when the house has a fuel-burning appliance inside the air barrier that isn't direct-vent or mechanically vented, such as an older gas water heater or furnace. Many pro-style hoods exceed 400 cfm. Your designer and HVAC contractor size the system, and the inspector checks it.
Can I keep using my kitchen during the extension?
For part of the job. The new space can be framed and closed in while the old kitchen still works. When the back wall comes out and the new cabinets go in, most families set up a temporary kitchen elsewhere in the house for a few weeks.
Does the old exterior wall come out completely?
Usually most of it does, to join the old and new space. That wall often carries the roof or a floor above, so an engineer sizes a beam and posts to replace it. The posts need footings or solid bearing all the way down to the foundation.