Long Island · Nassau & Suffolk

Rear and side house extensions on Long Island

Published Long Island prices, finished project (November 2026)
JobPublished LI rangeMedian
Rear or side addition (ground level) $80,000 – $340,000 $200,000
Great room or family room addition $50,000 – $100,000 $75,000 (one builder's midpoint)
Ground-level addition, per square foot $150 – $250 $200 (one builder's midpoint)
New foundation for a ground-level addition (Nassau) $15,000 – $40,000 $27,500 (one builder's midpoint)

Ranges come from Long Island contractors' own published price guides. Method and every source: Long Island dormer and addition price survey.

What an extension involves

Unlike a dormer, an extension starts in the ground. The order is: excavation, footings and foundation walls, backfill, the new floor deck, walls, a roof that ties into the house, and an opening cut through the old exterior wall. That last step usually means a beam or header, because the old wall often carries the roof or floor above.

Foundation choices

Foundation Good for Watch for
Full basement Most space, matches houses with basements Most excavation and cost
Crawlspace Plumbing and ducts stay reachable Needs ventilation or conditioning
Slab on grade Simple, low Pipes under concrete are hard to change

One Nassau design firm publishes $15,000 – $40,000 for a ground-level addition’s new foundation (published guide, checked November 2026). Footing depth and size follow the residential code’s foundation chapter (2025 RCNYS chapter 4) and your engineer’s design.

Setbacks and lot coverage

The biggest limit on a Long Island extension is usually the lot, not the budget. Rear yard setbacks, side yard setbacks and a cap on how much of the lot buildings can cover all apply. On a postwar lot, a deck, detached garage or shed can use up coverage you’d want for the addition. An architect runs the numbers on a current survey before drawing.

A worked example from the Town of Hempstead’s Levittown Planned Residence District (Town of Hempstead BZO Art. XV):

Rule Limit On a 6,000 sq ft lot
Rear yard (§ 189) 25 ft The house must stay 25 ft from the rear line
One-story rear addition (§ 190A(5)) Up to 240 sq ft may encroach, leaving at least 15 ft of rear yard A 12 x 20 ft room can reach 15 ft from the rear line
Building area (§ 185) 27.5% of the lot 1,650 sq ft of building area in total; ask the town what counts toward it

Arithmetic on the code limits. If a past variance reduced your yard, ask the town how the encroachment rules apply.

Tying the roof in

The new roof has to meet the old one without trapping water. Common solutions are a lower shed roof against the back wall, a gable that ties into the main roof with valleys, or a flat roof with a membrane. Each has different framing and flashing. Match the look of the house where you can, since some villages review exterior changes.

Cost at a glance

The table above lists published Long Island prices. Per square foot, one builder publishes $150 – $250 for ground-level additions. A kitchen or bathroom in the extension moves the price up. Fees sit on top: the Town of Hempstead, for example, charges $200 plus $18 per additional $1,000 of construction cost on residential work (Town of Hempstead L.L. 20-2024). See home addition cost for the full breakdown, and if you only need a few feet, consider a bump-out.

Frequently asked questions

How far back can I extend my house?

As far as your town or village's rear setback and lot coverage limits allow. Each code sets its own numbers by zoning district. An architect plots them on your survey, which shows exactly how much buildable room is left behind the house.

Does a rear extension need a basement under it?

No. Extensions sit on a full basement, a crawlspace or a slab. A basement adds the most space and cost. A crawlspace keeps plumbing and ducts reachable. A slab is the simplest but makes later plumbing changes harder. Matching the existing house's foundation type often makes the floor levels easiest to line up.

Can I extend over my cesspool or septic?

Not over an active system. The foundation can't sit on the cesspool or leaching rings, and moving them takes health department approval and adds cost. Health rules also set minimum distances between the system and the house. On many Long Island lots the sanitary system is in the backyard, right where an extension would go. Locate it before you design. Our cesspool guide explains the rules.

How long does a rear extension take to build?

Once the permit is issued, an extension moves from excavation and foundation to framing, rough-ins, inspections and finishes. A simple one-room extension is shorter than a kitchen extension with plumbing and cabinets. The paperwork before that, survey, plans and plan review, often takes as long as construction, and a variance hearing adds two to four months, according to one Long Island builder's cost guide. Our addition timeline walks through each step.

Sources

  1. Town of Hempstead Local Law 20-2024 amending § 86-11 fees (effective April 2, 2024)
  2. ICC: 2025 Residential Code of New York State chapter 4, foundations
  3. Town of Hempstead BZO Article XV: Levittown Planned Residence District (§§ 185, 189, 190)

Get a written price for your dormer, addition or repair

Tell us your town and the project. A licensed, independent Long Island contractor calls you back to talk through scope, permits and price before any work starts. Free to ask, no obligation.

Get a free quote Call (631) 503-0869
  • No fee to you
  • Price in writing first
Call (631) 503-0869 Get an estimate