Town of Riverhead Building Department
- Address
- 4 West Second Street, Riverhead, NY 11901
- Phone
- (631) 727-3200, ext. 213
- Website
- townofriverheadny.gov/203/Building
- Issues permits for
- Riverhead, Wading River, Calverton, Jamesport, Aquebogue, Baiting Hollow, Northville and Manorville (part).
What the application needs
The town’s residential building permit application lists (Town of Riverhead):
| Item | Riverhead’s requirement |
|---|---|
| Application | Two-page application and disclosure affidavit, signed and notarized; inspection acknowledgment checklist |
| Insurance | Contractor liability (ACORD, $2M/$1M minimum), workers’ compensation (C-105.2) and disability (DB-120.1), naming the town as certificate holder |
| Plans | Two complete sets per § 217-6, plus a digital copy if possible |
| Energy | REScheck or equivalent; an RCNYS insulation chart for additions under 500 sq ft |
| Surveys | Three plot plans or surveys showing the project and existing or proposed sanitary facilities, one with Health Department approval when required |
| Other approvals | FEMA floodplain requirements; DEC, Conservation Advisory Council, highway, water or sewer approvals if they apply; recorded covenants; a single-and-separate title search for nonconforming lots |
| Fees | Set by Town Code Chapter 217; non-refundable under § 217-12 |
The application form itself says plans must show elevations, floor plans, the run and size of joists, rafters and girders, footing and foundation details, and the grade and species of lumber. That’s more framing detail than many towns ask for up front, so make sure your designer includes it.
The inspection sequence
Riverhead’s inspection and CO sheet, revised September 3, 2026, lists the general inspections (Riverhead CO sheet):
- Footing forms and reinforcement, or pier excavation, before the pour.
- Footing keyway with foundation wall reinforcement.
- Foundation and dampproofing before backfill; a foundation location survey may be required.
- Under-slab plumbing, electric, insulation and slab prep.
- Framing, sheathing and strapping, before house wrap.
- Rough plumbing and rough electric.
- Insulation and draft stopping.
- Final building, plumbing and electrical inspections.
Step 5 is where wind connectors get checked. See what the framing inspection checks.
Deadlines and the CO
Inspections must be scheduled within four months of the permit. Construction must be finished and the certificate of occupancy obtained within 12 months, or the permit extended, and no permit can be extended past three years. Town Code § 217-16 adds that an enlarged or altered building can’t continue to be occupied more than 30 days after the work is done without a CO or temporary CO.
At closeout the town may ask for a final survey, a final flood elevation certificate, an electrical certificate, Suffolk County Health Department approval, a plumber’s affidavit, a final floor affidavit and a dark-skies lighting affidavit. If your lot is in a flood zone or unsewered, read flood zone additions and cesspools and additions.
Contacts
The Building Department is at 4 West Second Street, Riverhead, (631) 727-3200, ext. 213. If you’re weighing a sale against an addition, the East End’s transfer taxes are covered in move or add on.
Frequently asked questions
What do Riverhead building plans need to show?
The town's application asks for plans drawn to scale in duplicate showing elevations, floor plans, the run and size of joists, rafters and girders, footing and foundation details, plumbing and electrical schematics, and the grade and species of lumber. For additions under 500 square feet, an insulation chart can stand in for a REScheck report.
How long do I have to finish under a Riverhead permit?
The town's inspection sheet says inspections must be scheduled within four months of issuance, construction completed and the certificate of occupancy obtained within 12 months or the permit extended, and permits can't be extended beyond three years from issuance.
Can I use my addition before the CO in Riverhead?
Only briefly. Town Code § 217-16 says an enlarged or altered building can't continue to be occupied for more than 30 days after the work is complete unless a certificate of occupancy or temporary certificate has been issued.
What does Riverhead need for the sanitary system?
Three plot plans or surveys showing the location of the project and the existing or proposed sanitary facilities, with one bearing Health Department approval when that's required. Suffolk County health approval may also be needed before the CO.