Side by side
| Trusses | Stick-framed rafters | |
|---|---|---|
| Built | In a factory to an engineered design | On site from lumber |
| Speed | Fast to set | Slower |
| Attic | Webs fill the attic; little usable space | Open attic; room for storage or a future dormer |
| Changes later | Can’t be cut without an engineer | Can be headed off and reframed |
| Typical on Long Island | Newer houses and additions | Most postwar Capes and older houses |
New York’s 2025 Residential Code covers both in its roof-ceiling chapter, including the uplift tie-down every roof needs (2025 RCNYS, chapter 8).
The dormer problem
Most dormer framing advice assumes rafters. On a trussed roof, every chord and web is part of an engineered system. Cutting one to open the roof for a dormer can overload the rest. A dormer on trusses needs an engineer to redesign that section, often with girder trusses or a switch to stick framing around the opening. If you’re planning a shed dormer or an attic conversion, check which you have first: look in the attic for triangulated webs with metal gusset plates.
Attic use and floor loads
Standard trusses usually have bottom chords designed for ceiling loads, not bedrooms. The code designs uninhabitable attics for 10 or 20 pounds per square foot and habitable attics for 30 (2025 RCNYS, Table R301.5). If you want a usable attic later, specify attic or storage trusses at the start, or frame with rafters.
Truss notification
New York State requires notice when a residential structure uses truss-type, pre-engineered wood or timber construction (Executive Law § 382-b). The Town of North Hempstead’s residential permit requirements say the design professional must file a Residential Truss Notification when the project uses truss-type, pre-engineered wood or timber construction in floors, ceilings, roofs or beams (North Hempstead requirements).
Choosing for an addition or new house
Pick trusses for a simple roof built quickly when you won’t need the attic. Pick rafters, or attic trusses, when you want storage or a future dormer. Near the coast, either needs proper uplift connectors; see wind code framing. For new houses, see new home framing.
Frequently asked questions
Can I put a dormer on a house with roof trusses?
Not by simply cutting the trusses. Each truss is designed as a unit, and cutting a chord or web can make it fail. A dormer on a trussed roof needs an engineer's design, which may mean replacing trusses in that area with special girder trusses or stick framing.
Are trusses cheaper than rafters?
Often for new construction with simple roofs, because they're built in a factory and set quickly. Rafters can cost more in labor but give usable attic space and flexibility for future dormers.
What is a residential truss notification?
New York State requires notice when a residential structure uses truss-type, pre-engineered wood or timber construction (Executive Law § 382-b and 19 NYCRR Part 1265), so firefighters know how the structure may behave in a fire. The Town of North Hempstead's permit requirements say the design professional must file a Residential Truss Notification in that case.
Do trusses need hurricane ties?
Roof framing of either type must be tied down to resist uplift under the residential code. In high-wind areas, each truss usually gets a metal connector at the wall, as specified on the plans.
Sources
- Town of North Hempstead: requirements for submittal of a residential building permit (residential truss notification)
- ICC: 2025 Residential Code of New York State chapter 8, roof-ceiling construction (R802 rafters and trusses, R802.11 uplift)
- ICC: 2025 Residential Code of New York State chapter 3 (Table R301.5 attic live loads)
- NY Executive Law § 382-b: truss type, pre-engineered wood and timber construction notice